logo

Cement Blanket for Industrial Drainage Channels - Corrosion-Resistant Liner for Heavy-Duty Industrial Use

80㎡
MOQ
Inquire anytime
가격
Cement Blanket for Industrial Drainage Channels - Corrosion-Resistant Liner for Heavy-Duty Industrial Use
풍모 갤러리 제품 설명 따옴표를 요구하십시오
풍모
제품 사양
재료: 섬유 섬유 및 시멘트 파우더
너비: 4m
길이: 20m-50m
강조하다:

corrosion-resistant cement blanket

,

industrial drainage channel liner

,

heavy-duty cement blanket liner

기본 정보
원래 장소: 중국
브랜드 이름: JIANYI
인증: ISO9001
결제 및 배송 조건
포장 세부 사항: 방수 및 먼지 방지 외장 포장
배달 시간: 5-8일
지불 조건: 티/티
공급 능력: 600t/month
제품 설명
Industrial Cement Blanket for Drainage Channels
Corrosion-resistant liner engineered for heavy-duty industrial applications with exceptional chemical resistance and durability.
Product Overview
Our industrial-grade cement blanket is specifically designed to withstand harsh conditions in industrial drainage systems. The product features a chemical-resistant cementitious core reinforced with high-strength fiberglass for superior performance.
Key Features
  • Chemical-resistant cementitious core withstands corrosive environments
  • High-strength fiberglass reinforcement for structural integrity
  • Resistant to acids, alkalis, and industrial solvents
  • Flexible design for installation in complex channel shapes
  • Long-term durability in corrosive wastewater environments
  • Suitable for rectangular, trapezoidal, and circular channels
Industrial Applications
Specifically engineered for lining industrial drainage channels across multiple sectors:
Application Area Benefits
Chemical Plant Wastewater Channels Prevents soil erosion and groundwater contamination
Power Plant Cooling Water Channels Resists chemical corrosion from cooling agents
Factory Sewage Ditches Reduces maintenance costs and channel repairs
Mining Drainage Systems Withstands heavy industrial use and chemical exposure
Industrial Storage Yard Drainage Prevents water accumulation and material damage
Environmental Compliance
Meets industrial environmental protection standards by preventing wastewater seepage and protecting groundwater resources from industrial contamination.
Installation Process
  1. Channel Preparation: Remove industrial residues, oil stains, and loose debris from the channel surface. Clean thoroughly with water and ensure complete drying before installation.
  2. Laying & Securing: Roll out the cement blanket along the channel, ensuring tight contact with walls and bottom. Overlap joints by 15cm and secure with corrosion-resistant anchor bolts (stainless steel recommended).
  3. Curing Process: Spray water evenly across the blanket surface. Avoid direct contact with industrial wastewater during curing. Allow 48 hours for initial hardening and 10 days for full strength development before introducing wastewater flow.
추천된 제품
우리와 연락하기
담당자 : Ms. Zhang
전화 번호 : 86-13332517898
남은 문자(20/3000)